Punctured At Puncheur

Pre Puncheur Prep
Prepping the bikes before the Puncheur. From right: his, her, and Guildford Brompton Dock’s.
End of (not the full) Puncheur
Driving wind & horizontal rain greeted us (me & the bike) atop the beacon. DNF on the Puncheur, yet just had to ride up here :)
Post Puncheur
Cold, hungry and greeted by a Chewie who’d not seen us for almost 10 hours. These’ll have to wait till tomorrow for a clean-up.
Punctured At Puncheur

Leave a Reply